Home / Resources / How to purge PUR hot melt

How to Purge PUR Hot Melt

PUR left in a melter will cure there. Purge before it does. Here is the routine for shift end, weekends and changeovers.

How do I purge PUR from my melter?

At processing temperature, drain the remaining PUR, load a PUR purge (Cattie PUR-Purge-8530, run at 250 to 350°F, or 9006 PUR cleaner), circulate it, and push it through the hoses and nozzle until it comes out clean. For a shutdown, leave the purge in the unit. At startup, flush with fresh PUR until no purge shows. Never run production on purge.

Call 800-249-0337

PUR cures with moisture. It will cure in the tank, hoses and nozzle if you leave it, and you typically must scrape out cured PUR. A regular purge routine is what keeps a PUR line running.

Contains reactive isocyanate. Read the SDS before use; use ventilation and protective gear; hot melt can cause burns. Call us for data sheets

Purge steps

  1. Keep the unit at processing temperature. Drop pump pressure to zero.
  2. Drain the remaining PUR at temperature, using non-metal tools only. Hot material: wear heat-resistant gloves and eye protection.
  3. Load PUR purge: PUR-Purge-8530 (runs at 250–350°F) or 9006 PUR cleaner.
  4. Circulate typically about 15 to 30 minutes at processing temperature. Allow longer if gel or char is present. Follow the purge product’s instructions.
  5. Push purge through the hoses and nozzle until it comes out, not just the tank. Change any inline filters.
  6. For a shutdown, stop here and leave the purge in the unit.
  7. At startup, flush with a small charge of fresh PUR until no purge shows, and discard the first few shots. Then start production.

Holiday shutdown

Shutting down from mid-November through the holidays? Purge before you shut down and leave the purge in the unit. In January, bring the unit to temperature and flush with fresh PUR until no purge shows before production. Call 800-249-0337 to plan your shutdown purge.

When to purge

SituationWhat to do
Holiday or long shutdownPurge and leave the purge in the unit. Flush with fresh PUR before production on restart.
End of shift or weekendPurge and leave the purge in the unit. Flush with fresh PUR at startup.
Before a run on a cold unitPurge, flush with fresh PUR, then start production.
Changing to EVA or another hot meltPurge PUR fully first, then follow your equipment maker’s changeover steps.
Signs of gel or rising viscosityPurge now, and allow a longer circulation.

Small binders

On tabletop and single-clamp binders, load PUR-Purge-8530 or 9006 purge flake, run it through, then shut down or restart, following your binder maker’s procedure. Cattie’s 100 g foil packs help you load only what the run needs. See how to run PUR on a small binder.

Always follow your equipment maker’s procedure for your melt unit.

Call 800-249-0337 Request a quote

Cattie cleaning products for this job

  • PUR-Purge-8530. PUR purge. Also cleans APO and EVA out when you switch a line to PUR.
  • 9006 PUR cleaner. Powder at room temperature, liquid at run temperature.
  • 8907 PUR cleaner. 100% solids, listed at 0 VOC.

Related

PUR hot melt · Edgebanding adhesives · PUR safe handling FAQ · How to handle reactive hot melt · How to clean a hot melt system · Hot melt charring and gelling

PUR purge FAQ

What does Cattie sell to purge PUR?

PUR-Purge-8530 purge compound, run at 250 to 350°F, and 9006 PUR cleaner.

How long should I circulate purge?

Typically about 15 to 30 minutes at processing temperature, longer if gel or char is present. Follow the purge product’s instructions.

Can I leave purge in the melter over a weekend?

Yes. Purge and leave the purge in the unit at shutdown, then flush with fresh PUR at startup until no purge shows. Never run production on purge.

What if PUR has already cured in the tank?

Cured PUR does not remelt and can only be removed mechanically, by scraping. Purging on schedule prevents it. Call 800-249-0337 if you are dealing with a cured unit.

Can I switch back to EVA after PUR?

Yes, many shops run both. Purge the PUR fully first, then follow your equipment maker’s changeover steps.

Industrial hot-melt coater applying adhesive to a continuous web

Need an adhesive or a cleaner?

Call 800-249-0337 or email sales@cattieadhesives.com. Cattie Adhesives, Quakertown, PA.