Home / Resources / How to apply, handle, clean up, and store reactive hot melt adhesive
How to apply, handle, clean up, and store reactive hot melt adhesive
Reactive hot melt (PUR) sets as it cools, then moisture-cures. Use equipment built for PUR, not a conventional hot-melt tank. Call 800-249-0337 for the SDS.
Preview · about 1 minute
Plant-floor overview. Unlock below for the full converter checklist.
What are reactive hot melt adhesives?
Reactive hot melts from Cattie are solvent-free, 100% solids adhesives. They are thermosetting: they set as they cool, then crosslink with moisture in the air and in the substrate.
Contains reactive isocyanate. Read the SDS before use; use ventilation and protective gear; hot melt can cause burns. Call us for data sheets
That second cure is what gives PUR better creep, heat, and moisture resistance than a conventional hot melt. See the PUR hot melt product page for grades.
Clean-up in one line
Purge PUR before it cures: drain at processing temperature, run PUR-Purge-8530 or 9006 PUR cleaner through the tank, hoses and nozzle, and leave the purge in the unit for a shutdown. Full steps: how to purge PUR hot melt. For conventional hot melt, see how to clean a hot melt system.
Cattie cleaning products for this job
- PUR-Purge-8530. PUR purge. Also cleans APO and EVA out when you switch a line to PUR.
- 9006 PUR cleaner. Powder at room temperature, liquid at run temperature.
- 8907 PUR cleaner. 100% solids, listed at 0 VOC.
Holiday shutdown? Purge before you shut down, then flush with fresh PUR before production in January. Call 800-249-0337.
What's in this guide
- How do they differ from conventional hot melts?
- How to apply it
- Set time vs cure time
- Clean up
- Handling and storage
- Safety
Longer plant training (5–10 min)
Coming soon — downloadable deep-dive for the floor.
General plant guidance only — not a substitute for your process, SDS/TDS, or line trials. Call 800-249-0337 to match a grade.